Moon Palace Cancún
Moon Palace is a revenue-recoverability story, and lenders, insurers, and buyers will price that distinction.
Moon Palace Cancún is a flagship all-inclusive resort platform: 2,404 rooms, ~140,000 sq. ft. of event space, major leisure and group demand, and a globally recognizable destination. The asset’s strength is obvious. Mendria’s finding is that the same features that create enormous value, including scale, beachfront positioning, group/event dependence, and all-inclusive operating complexity, also create a hidden capital-markets question: Can the owner prove that revenue survives and recovers quickly through hurricane, insurance, business-interruption, beach/sargassum, and access-disruption stress?
If that proof is not lender-, insurer-, and buyer-ready, the resort can be repriced before occupancy or RevPAR visibly weaken: lenders require reserves or reduce proceeds; insurers tighten named-storm and BI terms; buyers widen discounts for downtime and recovery uncertainty; group customers demand stronger cancellation and rebooking protections. Mendria estimates $50M–$120M of exit value at stake and $25M–$60M of refinance friction unless revenue continuity is documented and defended.
Do not treat this as a generic coastal resort risk file. Treat it as a revenue continuity underwriting case.
The highest-value move is to build a Revenue Defensibility Package that proves the resort can protect cash flow, recover fast, and remain financeable under stress.
Priority actions:
- Prove the insurance actually protects the revenue model
- named-storm deductible
- BI waiting periods, sublimits, and exclusions
- whether BI covers rooms, F&B, meetings, weddings, and group blocks
- 5–10 year loss runs and carrier posture
- Convert “we have a storm plan” into a lender-ready recovery model
- 7 / 14 / 30-day reopening timeline
- power, water, cooling, kitchen, laundry, staffing, and supplier continuity
- guest relocation and rebooking protocol
- airport / access-disruption contingency
- Defend the resort’s highest-value revenue streams
- group/event booking pace
- cancellation and room-block attrition sensitivity
- event-space downtime assumptions
- rebooking protocol after named-storm disruption
- Make beach operability an underwriting variable, not an ops footnote
- sargassum cleanup spend and seasonality
- beach barriers / removal logistics
- guest satisfaction and ADR sensitivity
- alternative programming when beach usability deteriorates
- Rank resilience capex by refinance and exit impact
- roof / openings / envelope
- backup power and water systems
- drainage and critical MEP
- beachfront operations
- which upgrades reduce downtime, insurance friction, and buyer discounting
